We manage the safe transition of railway projects into operation in line with ERA and SMS standards.

Operational Transition & Safety-Focused Technical Consultancy

The operational transition phase in railway projects is not merely about completing the system technically; it is about putting the system into service in a safe, controlled and fully regulation-compliant manner. Under the EU railway safety legislation, this phase is handled within the framework of the Safety Management System (SMS) and is critical for preventing project risks from being carried over into operation.

  • As SI Global, we provide operational transition and safety-focused technical consultancy services to railway infrastructure managers and railway undertakings. This service directly relates to the ERA Safety Management System (SMS) approach, Common Safety Method (CSM) requirements and the TSI OPE (Operation & Traffic Management TSI) guidelines.
  • Operational Transition from the ERA Perspective

    Under the SMS framework, ERA requires operators to;

    • Identify pre-operational risks
    • Verify safety requirements
    • Assess the safety impact of changes
    • Manage commissioning under controlled conditions

    These obligations are defined in ERA's Safety Management System (SMS) framework and TSI OPE documents, which require operational readiness and safety control processes to be carried out as part of the SMS in an integrated manner.

    Operational Transition Diagram

    What does SI Global do in this scope?

    SI Global handles the operational transition process from an independent safety and technical consultancy perspective and ensures that projects are safety-ready before they enter service.

    • Pre-commissioning operational safety assessments
    • CSM Risk Assessment (CSM RA) for technical, operational and organisational changes
    • Definition and verification of safety requirements
    • Structuring of operational readiness processes within the SMS
    • Review of commissioning documentation against ERA and National Safety Authority requirements
    • Independent technical and safety consultancy for project teams during transition
    • Monitoring and recording of operational risks

    — delivered end-to-end.

    In which projects is this service required?

    • New railway lines and infrastructure projects
    • Commissioning of high-speed and conventional lines
    • Signalling, energy and system modernisations
    • Operational process and organisational changes
    • Re-commissioning of existing lines

    In these projects, the operational transition phase cannot be carried out without SMS and CSM RA integration.

    Our Approach

    In operational transition and commissioning processes, SI Global is positioned not on the project side, but on the safety side. We take ERA legislation as our reference, while incorporating operational realities on site and producing auditable, traceable and sustainable solutions.

    Our goal is not only the commissioning of projects, but their safe transition into operation.

    Official ERA reference areas

    • • ERA – Safety Management System (SMS)
    • • Common Safety Method (CSM) – Risk Assessment
    • • TSI OPE – Operation & Traffic Management
    • • Directive (EU) 2016/798 – Railway Safety Directive